Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13571730

- Product Categories
- Friendly Links
Information Name: | J-151 high elastic waterproof slurry |
Published: | 2014-09-25 |
Validity: | 360 |
Specifications: | |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | I. Product Overview J-151 is a two component flexible waterproof slurry, high polymer modified cement-based waterproof coatings. It is composed of cement, an inorganic filler, powder and liquid special additives for emulsion polymerization of the composition. It's waterproof mechanism is inorganic powder is mixed with an organic polymer emulsion reaction to form a highly elastic, strong adhesion, no cracking, anti-aging, weathering good waterproof membrane to prevent water infiltration, is a breathable and waterproof The pollution-free waterproof material. Second, features the advantages of a product is a water-based waterproof coatings, non-toxic, harmless, non-polluting, are environmentally friendly products. 2, the product can be constructed directly on wet or dry surfaces of various materials base. 3, the coating tough high elasticity, water resistance, weather resistance, excellent durability, particularly suitable for road, bridge waterproofing and pigments may be added to form a color coat. 3, the product can be in the facade, the slope and the top surface of the direct construction, does not flow yet, simple construction, easy operation, short construction period, at room temperature 6 hours to dryness, and the use of this product waterproof coating can also be easy to repair. 4, with the base surface of cement mortar and other grass-roots firmly bonded materials is ideal for repair adhesive material, can form dense stable overall seamless flexible waterproof layer. 5, breathable, waterproof coating has a "breathing" function. Third, the scope 1, inside the outer wall waterproofing, roof or platform waterproof. 2, wall waterproof coating, waterproof concrete structure any. 3, between the bathroom waterproof coating. 4, interior and exterior basement waterproofing. 5, swimming pools, reservoirs inner waterproof coating. Fourth, the technical indicators: No. Type I Type II test items 1 Tensile strength MPa ≥1.2 ≥1.8 2 Elongation at break% ≥200 ≥80 3 impermeability 0.3 MPa, 30min impervious 0.3 MPa, 30min impervious 4 Drying Schedule drying time h ≤4 ≤4 Drying time h ≤8 ≤8 5 bond strength (wet base) MPa ≥0.5 ≥1. 0 V. Construction Technology 1, base treatment (1), the base surface if hollowing, loose , super sand, ash fall, cracks, water and other defects, should be treated in advance. (2), first base surface moist with plenty of water or brushing again with the interface treatment agent, in order to ensure a strong adhesion. 2, the construction method (1), the A, B two components by mixing with an electric mixer stir together 5min, so that even non-agglomerated particles, and then with a roller or brush under the direction of the brush above the base surface . (2) After the first pass coat is dry, apply a second time, usually applied 2 to 3 times. Six, construction points attention to achieve a good waterproof effect, the construction should pay attention to the following special conditions: (a), if the base surface cracks, the crack can be coated with a layer of glue in the cracks, leaks must first use The company's rapid water did not leak plugging process, significant cracks in the building process can be coated with a caulking sealant. (2), yin and yang angle should be made circular arc angle, such as the base surface and extending structure. (3), there are yin and yang angle, gutters, flashings, fall-mouth, tubes and other parts of the first root again after brushing the paint, and immediately paste fiberglass cloth, enhance its toughness. (4), should not or snow below 0 degrees in construction, not construction in particular damp, unventilated environment, or affect the film. (5), and is easy to touch the outside, a site easy pedaling waterproof coating the protective layer should be done, construction of the protective layer is required to be waterproof layer is complete after 2 days. (6), when the basement waterproofing, waterproof coating after completion of flooding can not be immediately, subject to the waterproof layer and solidified before soaking after a certain strength. Seven, storage and packaging: a liquid material shall be kept in shade above 5 ℃, the powder should be stored in a dry place. Pay attention to moisture, sun, shelf life of six months. 2, the product powder composite bags, liquid material with a plastic drum. 5kg / set, 10 kg / sets, 42kg / set |
Admin>>>
You are the 7079 visitor
Copyright © GuangDong ICP No. 10089450, Waterproof Materials Co., Ltd. Huai'an Bolong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7079 visitor
Copyright © GuangDong ICP No. 10089450, Waterproof Materials Co., Ltd. Huai'an Bolong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility